Triple

T18807926
Position Surface form Disambiguated ID Type / Status
Subject Vicken Parsons E459927 entity
Predicate typicalWorkScale P87672 FINISHED
Object small-scale LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: small-scale | Statement: [Vicken Parsons, typicalWorkScale, small-scale]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: typicalWorkScale
Context triple: [Vicken Parsons, typicalWorkScale, small-scale]
  • A. workScale chosen
    Indicates the relative magnitude, intensity, or scope at which a given work activity, project, or operation is carried out.
  • B. typicalRange
    Indicates the usual or expected range of values, conditions, or states within which something normally occurs or applies.
  • C. typicalWorkflow
    Indicates that one process, sequence, or set of actions represents the standard or commonly followed way of performing a task or achieving a goal.
  • D. standardizedWork
    Indicates that an entity follows a defined, consistent method or procedure that has been formally established as the standard way of performing a task or process.
  • E. workPeriod
    Indicates the span of time during which an entity is engaged in a particular work or employment activity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d398c7d4819091cb2f7e48948aeb completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5a3d8ab9c819097834eac798ce810 completed April 20, 2026, 3:56 a.m.
PD Predicate disambiguation batch_69e48d1b10ec8190985c6fb5766ff981 completed April 19, 2026, 8:06 a.m.
Created at: April 10, 2026, 11:53 a.m.