Triple

T18803330
Position Surface form Disambiguated ID Type / Status
Subject Works Division E459810 entity
Predicate projectLifecycleRole P124720 FINISHED
Object planning of works projects LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: planning of works projects | Statement: [Works Division, projectLifecycleRole, planning of works projects]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: projectLifecycleRole
Context triple: [Works Division, projectLifecycleRole, planning of works projects]
  • A. roleInProjectLifecycle chosen
    Indicates the specific function or responsibility an entity has at a particular stage of a project's lifecycle.
  • B. roleInCompanyLifecycle
    Indicates the specific function or responsibility an entity has at a particular stage of a company's lifecycle.
  • C. portfolioRole
    Indicates the specific function, capacity, or position an entity holds within a portfolio or collection of assets.
  • D. plannedRole
    Indicates that an entity is expected or intended to assume a particular role or function in a planned or future context.
  • E. roleInOperation
    Indicates that an entity holds a specific function, duty, or position within a particular operation or activity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d398c7d4819091cb2f7e48948aeb completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5a0253f748190998995e3b1524357 completed April 20, 2026, 3:40 a.m.
PD Predicate disambiguation batch_69e48d16dd34819096e096d0c0e4c15c completed April 19, 2026, 8:06 a.m.
Created at: April 10, 2026, 11:53 a.m.