Triple

T18796659
Position Surface form Disambiguated ID Type / Status
Subject Trollhättan hydropower area E459650 entity
Predicate isPartOf P10 FINISHED
Object Göta älv hydropower system NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Göta älv hydropower system | Statement: [Trollhättan hydropower area, isPartOf, Göta älv hydropower system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Göta älv hydropower system
Context triple: [Trollhättan hydropower area, isPartOf, Göta älv hydropower system]
  • A. Lule River hydropower system
    The Lule River hydropower system is a major network of dams, reservoirs, and power stations in northern Sweden that harnesses the Lule River’s flow to generate a significant share of the country’s hydroelectric power.
  • B. Älvkarleby hydropower station
    Älvkarleby hydropower station is a major Swedish hydroelectric facility on the Dalälven River, known for its early 20th-century construction and role in regional power generation.
  • C. Trollhättan hydropower area
    Trollhättan hydropower area is a major Swedish hydroelectric power complex built around the Trollhättan Falls on the Göta älv river, known for its dams, power stations, and role in regional energy production.
  • D. Siljan hydroelectric installations
    The Siljan hydroelectric installations are a series of power-generating facilities in the Siljan region of Sweden that harness the flow of the Dalälven river to produce renewable electricity.
  • E. Sira-Kvina hydropower system
    The Sira-Kvina hydropower system is a major Norwegian hydroelectric power complex that harnesses the Sira and Kvina river systems through multiple dams, reservoirs, and power stations to generate renewable energy.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Göta älv hydropower system
Target entity description: The Göta älv hydropower system is a network of hydroelectric facilities along Sweden’s Göta älv river that collectively generate significant renewable electricity and support regional water management.
  • A. Lule River hydropower system
    The Lule River hydropower system is a major network of dams, reservoirs, and power stations in northern Sweden that harnesses the Lule River’s flow to generate a significant share of the country’s hydroelectric power.
  • B. Älvkarleby hydropower station
    Älvkarleby hydropower station is a major Swedish hydroelectric facility on the Dalälven River, known for its early 20th-century construction and role in regional power generation.
  • C. Trollhättan hydropower area chosen
    Trollhättan hydropower area is a major Swedish hydroelectric power complex built around the Trollhättan Falls on the Göta älv river, known for its dams, power stations, and role in regional energy production.
  • D. Siljan hydroelectric installations
    The Siljan hydroelectric installations are a series of power-generating facilities in the Siljan region of Sweden that harness the flow of the Dalälven river to produce renewable electricity.
  • E. Sira-Kvina hydropower system
    The Sira-Kvina hydropower system is a major Norwegian hydroelectric power complex that harnesses the Sira and Kvina river systems through multiple dams, reservoirs, and power stations to generate renewable energy.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d398c7d4819091cb2f7e48948aeb completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5a01ed3c08190890d9518ed69fdee completed April 20, 2026, 3:40 a.m.
Created at: April 10, 2026, 11:53 a.m.