Triple

T18796386
Position Surface form Disambiguated ID Type / Status
Subject European Court of Human Rights extension studies E459644 entity
Predicate instanceOf P0 FINISHED
Object design and planning project C17777 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: design and planning project
Context triple: [European Court of Human Rights extension studies, instanceOf, design and planning project]
  • A. project chosen
    A project is a temporary, goal-oriented endeavor composed of coordinated tasks and resources undertaken to create a unique product, service, or result within defined constraints.
  • B. interior design project
    An interior design project is a planned and coordinated process of transforming an interior space’s function, aesthetics, and atmosphere through the selection and arrangement of materials, furnishings, colors, lighting, and spatial layouts to meet specific client needs and style goals.
  • C. sustainable design project
    A sustainable design project is an initiative that plans, develops, and implements solutions minimizing environmental impact while balancing social responsibility and economic viability throughout a product, service, or system’s life cycle.
  • D. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • E. garden design project
    A garden design project is a planned endeavor that organizes and coordinates the creation or transformation of an outdoor space to achieve specific aesthetic, functional, and environmental goals.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d398c7d4819091cb2f7e48948aeb completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:53 a.m.