Triple
T18789611
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pickwick Lock |
E459474
|
entity |
| Predicate | enablesPassageThrough |
P77090
|
FINISHED |
| Object | Pickwick Landing Dam |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pickwick Landing Dam | Statement: [Pickwick Lock, enablesPassageThrough, Pickwick Landing Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Pickwick Landing Dam Context triple: [Pickwick Lock, enablesPassageThrough, Pickwick Landing Dam]
-
A.
Pickwick Landing Dam
chosen
Pickwick Landing Dam is a Tennessee Valley Authority hydroelectric and navigation dam on the Tennessee River in southwestern Tennessee.
-
B.
Pickwick Dam
Pickwick Dam is a hydroelectric and flood-control dam on the Tennessee River in Tennessee, forming Pickwick Lake and supporting regional power generation and recreation.
-
C.
Hoist Dam
Hoist Dam is a hydroelectric dam on Michigan’s Dead River that helps generate power and regulate water flow in the region.
-
D.
Rockport Dam
Rockport Dam is a water-control structure on the Weber River in Utah that creates Rockport Reservoir for irrigation, recreation, and flood management.
-
E.
Hugh Keenleyside Dam
The Hugh Keenleyside Dam is a major hydroelectric and flood-control dam on the Columbia River in British Columbia, Canada, forming part of the Columbia River Treaty projects between Canada and the United States.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: enablesPassageThrough Context triple: [Pickwick Lock, enablesPassageThrough, Pickwick Landing Dam]
-
A.
isPassedThroughBy
Indicates that something serves as a medium, route, or channel through which another thing moves, flows, or is transmitted.
-
B.
supportsPassthrough
Indicates that one entity enables or allows another entity’s data, signals, or operations to pass through it unchanged.
-
C.
passesThroughArea
Indicates that an entity moves or extends through the spatial region defined by another entity or area.
-
D.
enablesTraversal
chosen
Indicates that one entity provides the means or capability for another entity to move through, across, or along something.
-
E.
canPass
Indicates that one entity is able or permitted to move through, cross, or successfully traverse another entity or barrier.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d396f54c8190ba49db31e8743842 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e59784c5988190851755b7f47835e5 |
completed | April 20, 2026, 3:03 a.m. |
| PD | Predicate disambiguation | batch_69e48d16dd34819096e096d0c0e4c15c |
completed | April 19, 2026, 8:06 a.m. |
Created at: April 10, 2026, 11:53 a.m.