Triple
T18777377
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MV Oceanic Vega |
E459166
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | offshore support vessel |
C27805
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: offshore support vessel Context triple: [MV Oceanic Vega, instanceOf, offshore support vessel]
-
A.
floating production storage and offloading vessel
A floating production storage and offloading vessel is an offshore ship-shaped facility that processes hydrocarbons from subsea wells, stores the produced oil, and offloads it to shuttle tankers for transport.
-
B.
maritime vessel
chosen
A maritime vessel is a watercraft designed and constructed to navigate and operate on seas or oceans for purposes such as transportation, commerce, defense, or recreation.
-
C.
cargo vessel
A cargo vessel is a large ship designed to transport goods and materials across bodies of water, often over long international routes.
-
D.
motor vessel
A motor vessel is a powered watercraft propelled primarily by engines rather than sails or human effort, used for transporting people, goods, or performing specialized maritime tasks.
-
E.
naval auxiliary ship
A naval auxiliary ship is a non-combat vessel that supports naval operations by providing services such as supply, repair, transport, and logistical assistance to combat ships and shore facilities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d396f54c8190ba49db31e8743842 |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:52 a.m.