Triple

T18777171
Position Surface form Disambiguated ID Type / Status
Subject RRS Sir David Attenborough E459160 entity
Predicate instanceOf P0 FINISHED
Object icebreaking research ship C18206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: icebreaking research ship
Context triple: [RRS Sir David Attenborough, instanceOf, icebreaking research ship]
  • A. oceanographic research ship
    An oceanographic research ship is a specialized vessel equipped with scientific instruments and laboratories for studying the physical, chemical, biological, and geological properties of the ocean.
  • B. icebreaker ship chosen
    An icebreaker ship is a specially designed vessel with a reinforced hull and powerful engines used to navigate through and clear paths in ice-covered waters.
  • C. atmospheric research vessel
    An atmospheric research vessel is a specialized mobile platform, such as an aircraft, balloon, or airship, equipped with scientific instruments to observe, sample, and analyze the properties and dynamics of planetary atmospheres.
  • D. exploration vessel
    An exploration vessel is a specialized craft designed to travel into unknown or remote regions to gather data, conduct research, and support long-duration exploratory missions.
  • E. experimental ship
    An experimental ship is a prototype vessel designed to test new technologies, configurations, or performance concepts under real-world maritime conditions before they are adopted for wider use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d396f54c8190ba49db31e8743842 completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:52 a.m.