Triple

T18763445
Position Surface form Disambiguated ID Type / Status
Subject SM-3 Block IIA E458833 entity
Predicate predecessor P97 FINISHED
Object SM-3 Block IB NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SM-3 Block IB | Statement: [SM-3 Block IIA, predecessor, SM-3 Block IB]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SM-3 Block IB
Context triple: [SM-3 Block IIA, predecessor, SM-3 Block IB]
  • A. SM-3 Block IA
    SM-3 Block IA is an early variant of the U.S. Navy’s ship-based Standard Missile-3 interceptor designed to engage short- to intermediate-range ballistic missiles in the midcourse phase of flight.
  • B. SM-3 Block IIA
    The SM-3 Block IIA is an advanced, ship- and land-based ballistic missile defense interceptor co-developed by the United States and Japan, designed to engage medium- and intermediate-range ballistic missiles in space.
  • C. SS-13 Savage ICBM
    The SS-13 Savage ICBM was an early Soviet solid-fueled intercontinental ballistic missile developed during the Cold War for strategic nuclear deterrence.
  • D. SS-20 Saber IRBM
    The SS-20 Saber was a Soviet intermediate-range ballistic missile deployed during the Cold War, notable for its mobility, multiple nuclear warheads, and central role in triggering the NATO missile deployments and the INF Treaty negotiations.
  • E. SS-11 Sego ICBM
    The SS-11 Sego was an early Soviet silo-based intercontinental ballistic missile developed during the Cold War to deliver nuclear warheads to long-range strategic targets.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SM-3 Block IB
Target entity description: SM-3 Block IB is a variant of the U.S. Navy’s ship-based Standard Missile-3 designed for ballistic missile defense, featuring improved guidance and targeting capabilities over earlier versions.
  • A. SM-3 Block IA
    SM-3 Block IA is an early variant of the U.S. Navy’s ship-based Standard Missile-3 interceptor designed to engage short- to intermediate-range ballistic missiles in the midcourse phase of flight.
  • B. SM-3 Block IIA
    The SM-3 Block IIA is an advanced, ship- and land-based ballistic missile defense interceptor co-developed by the United States and Japan, designed to engage medium- and intermediate-range ballistic missiles in space.
  • C. SS-13 Savage ICBM
    The SS-13 Savage ICBM was an early Soviet solid-fueled intercontinental ballistic missile developed during the Cold War for strategic nuclear deterrence.
  • D. SS-20 Saber IRBM
    The SS-20 Saber was a Soviet intermediate-range ballistic missile deployed during the Cold War, notable for its mobility, multiple nuclear warheads, and central role in triggering the NATO missile deployments and the INF Treaty negotiations.
  • E. SS-11 Sego ICBM
    The SS-11 Sego was an early Soviet silo-based intercontinental ballistic missile developed during the Cold War to deliver nuclear warheads to long-range strategic targets.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d395dba0819087568404508590cb completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e58d80a954819083946dafc0c7af05 completed April 20, 2026, 2:20 a.m.
Created at: April 10, 2026, 11:52 a.m.