Triple
T18763411
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vertical Launching System (planned) |
E458832
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | missile launch system |
C41585
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: missile launch system Context triple: [Vertical Launching System (planned), instanceOf, missile launch system]
-
A.
ballistic missile
A ballistic missile is a guided projectile that is launched into a high, arching trajectory and primarily follows a ballistic path under gravity to deliver a warhead to a distant target.
-
B.
missile defense command and control system
A missile defense command and control system is an integrated network of sensors, communication links, decision-support tools, and engagement controls that detects, tracks, evaluates, and coordinates responses to missile threats in real time.
-
C.
surface-to-surface missile
A surface-to-surface missile is a guided weapon launched from land or sea platforms designed to strike targets located on the Earth's surface.
-
D.
rocket-boosted missile
A rocket-boosted missile is a guided or unguided projectile that uses rocket propulsion to rapidly accelerate and deliver a warhead or payload to a distant target.
-
E.
cruise missile
A cruise missile is a guided, self-propelled weapon that flies at low altitude along a pre-programmed path to deliver a precise payload to a distant target.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d395dba0819087568404508590cb |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:52 a.m.