Triple

T18751040
Position Surface form Disambiguated ID Type / Status
Subject Shippingport Atomic Power Station E458525 entity
Predicate instanceOf P0 FINISHED
Object commercial nuclear power plant C27232 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: commercial nuclear power plant
Context triple: [Shippingport Atomic Power Station, instanceOf, commercial nuclear power plant]
  • A. nuclear power facility chosen
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • B. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • C. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • D. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • E. nuclear industry company
    A nuclear industry company is an organization that designs, builds, operates, or services nuclear facilities and technologies for energy production, research, medicine, or defense while managing strict safety, regulatory, and environmental requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d394dc308190b6725073f5db324c completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:51 a.m.