Triple

T1874832
Position Surface form Disambiguated ID Type / Status
Subject Federal Power Act E39119 entity
Predicate instanceOf P0 FINISHED
Object electricity regulation law C5928 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electricity regulation law
Context triple: [Federal Power Act, instanceOf, electricity regulation law]
  • A. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • B. nuclear energy law
    Nuclear energy law is the body of legal rules, regulations, and international agreements that govern the safe, secure, and peaceful use, regulation, and oversight of nuclear materials, facilities, and activities.
  • C. energy policy legislation chosen
    Energy policy legislation is a body of laws and regulations that govern the production, distribution, consumption, and environmental impacts of energy resources within a jurisdiction.
  • D. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • E. regulatory authority
    A regulatory authority is an official body empowered by law to create, implement, and enforce rules and standards within a specific domain to protect public interests and ensure compliance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8862f7074819096afe7fe65e179e9 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:34 p.m.