Triple

T18747708
Position Surface form Disambiguated ID Type / Status
Subject Rajdhani Express E458446 entity
Predicate connectsTo P845 FINISHED
Object Guwahati NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Guwahati | Statement: [Rajdhani Express, connectsTo, Guwahati]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Guwahati
Context triple: [Rajdhani Express, connectsTo, Guwahati]
  • A. Guwahati chosen
    Guwahati is a major city in northeastern India, serving as a key cultural, economic, and transportation hub for the region.
  • B. Shillong
    Shillong is the capital city of the northeastern Indian state of Meghalaya, known for its scenic hills, colonial-era architecture, and vibrant cultural life.
  • C. Imphal
    Imphal is the capital city of the Indian state of Manipur, known for its scenic valleys, historic Kangla Fort, and cultural significance in Northeast India.
  • D. Dibrugarh
    Dibrugarh is a prominent city in northeastern India known as a major commercial and industrial hub of Assam, especially for its tea industry and oil and natural gas sectors.
  • E. Itanagar
    Itanagar is a northeastern Indian city known as the administrative and political center of Arunachal Pradesh, situated in the foothills of the Himalayas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d394dc308190b6725073f5db324c completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e579e9903c81908180c46012bd0948 completed April 20, 2026, 12:57 a.m.
Created at: April 10, 2026, 11:51 a.m.