Triple

T18747687
Position Surface form Disambiguated ID Type / Status
Subject Indian broad gauge E458445 entity
Predicate electrificationCompatibleWith P129395 FINISHED
Object 25 kV AC overhead systems LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 25 kV AC overhead systems | Statement: [Indian broad gauge, electrificationCompatibleWith, 25 kV AC overhead systems]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationCompatibleWith
Context triple: [Indian broad gauge, electrificationCompatibleWith, 25 kV AC overhead systems]
  • A. electrificationCompatibility chosen
    Indicates whether one entity can be effectively and safely powered, charged, or operated using the electrical system, standards, or infrastructure associated with another entity.
  • B. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • C. electrificationUsedFor
    Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
  • D. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • E. hasElectrificationStatus
    Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d394dc308190b6725073f5db324c completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e579e9903c81908180c46012bd0948 completed April 20, 2026, 12:57 a.m.
PD Predicate disambiguation batch_69e48d03766c8190a43f7681842f4f8d completed April 19, 2026, 8:06 a.m.
Created at: April 10, 2026, 11:51 a.m.