Triple

T18736487
Position Surface form Disambiguated ID Type / Status
Subject Borough of Tlalpan E458175 entity
Predicate hasTransportation P105 FINISHED
Object major highway Insurgentes Sur NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: major highway Insurgentes Sur | Statement: [Borough of Tlalpan, hasTransportation, major highway Insurgentes Sur]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: major highway Insurgentes Sur
Context triple: [Borough of Tlalpan, hasTransportation, major highway Insurgentes Sur]
  • A. Ortega Highway
    Ortega Highway is a scenic and winding mountain road in Southern California that connects Orange and Riverside counties through the Santa Ana Mountains.
  • B. General Velásquez expressway
    The General Velásquez expressway is a major urban freeway in Santiago, Chile, forming part of the city’s primary high-capacity road system.
  • C. Avenida Juárez corridor
    The Avenida Juárez corridor is a major thoroughfare in central Mexico City known for its historic architecture, cultural institutions, and role as a key connector between the Alameda Central and the city’s downtown area.
  • D. Santa Fe–Cuajimalpa road network
    The Santa Fe–Cuajimalpa road network is a key system of highways and arterial roads that links the borough of Cuajimalpa de Morelos with the major business and residential district of Santa Fe in western Mexico City.
  • E. Mexican Federal Highway 110
    Mexican Federal Highway 110 is a federal roadway in Mexico that connects various cities and towns across multiple states in the central-western region of the country.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: major highway Insurgentes Sur
Target entity description: Major highway Insurgentes Sur is a principal north–south arterial road in Mexico City that connects central areas with southern boroughs such as Tlalpan.
  • A. Ortega Highway
    Ortega Highway is a scenic and winding mountain road in Southern California that connects Orange and Riverside counties through the Santa Ana Mountains.
  • B. General Velásquez expressway
    The General Velásquez expressway is a major urban freeway in Santiago, Chile, forming part of the city’s primary high-capacity road system.
  • C. Avenida Juárez corridor
    The Avenida Juárez corridor is a major thoroughfare in central Mexico City known for its historic architecture, cultural institutions, and role as a key connector between the Alameda Central and the city’s downtown area.
  • D. Santa Fe–Cuajimalpa road network
    The Santa Fe–Cuajimalpa road network is a key system of highways and arterial roads that links the borough of Cuajimalpa de Morelos with the major business and residential district of Santa Fe in western Mexico City.
  • E. Mexican Federal Highway 110
    Mexican Federal Highway 110 is a federal roadway in Mexico that connects various cities and towns across multiple states in the central-western region of the country.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d394dc308190b6725073f5db324c completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e57689fa508190ad821d361cba9edf completed April 20, 2026, 12:42 a.m.
Created at: April 10, 2026, 11:51 a.m.