Triple
T18734456
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barakar River |
E458123
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Damodar Valley Project |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Damodar Valley Project | Statement: [Barakar River, partOf, Damodar Valley Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Damodar Valley Project Context triple: [Barakar River, partOf, Damodar Valley Project]
-
A.
Bhakra Nangal Project
The Bhakra Nangal Project is a major multipurpose river valley development scheme in India centered on the Bhakra and Nangal dams, providing irrigation, hydroelectric power, and flood control to northern states.
-
B.
Mahanadi River Valley Project
The Mahanadi River Valley Project is a major multipurpose river development scheme in India focused on flood control, irrigation, and hydroelectric power generation in the Mahanadi basin.
-
C.
Ujh Multipurpose Project
The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
-
D.
Narmada Dam project
The Narmada Dam project is a large and controversial river development and hydroelectric scheme in India, widely debated for its environmental and social impacts, including displacement of local communities.
-
E.
Umiam Hydel Project
Umiam Hydel Project is a hydroelectric power generation project in Meghalaya, India, that utilizes the waters of Umiam Lake to produce electricity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Damodar Valley Project Target entity description: The Damodar Valley Project is a major multipurpose river valley development scheme in eastern India focused on flood control, irrigation, power generation, and regional development in the Damodar River basin.
-
A.
Bhakra Nangal Project
The Bhakra Nangal Project is a major multipurpose river valley development scheme in India centered on the Bhakra and Nangal dams, providing irrigation, hydroelectric power, and flood control to northern states.
-
B.
Mahanadi River Valley Project
The Mahanadi River Valley Project is a major multipurpose river development scheme in India focused on flood control, irrigation, and hydroelectric power generation in the Mahanadi basin.
-
C.
Ujh Multipurpose Project
The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
-
D.
Narmada Dam project
The Narmada Dam project is a large and controversial river development and hydroelectric scheme in India, widely debated for its environmental and social impacts, including displacement of local communities.
-
E.
Umiam Hydel Project
Umiam Hydel Project is a hydroelectric power generation project in Meghalaya, India, that utilizes the waters of Umiam Lake to produce electricity.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d393ba9c8190a8b03b04ddbb0a09 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e56d7a06788190a8e09c657aaeb8e5 |
completed | April 20, 2026, 12:04 a.m. |
Created at: April 10, 2026, 11:51 a.m.