Triple

T18725064
Position Surface form Disambiguated ID Type / Status
Subject Project Seabird E457878 entity
Predicate instanceOf P0 FINISHED
Object naval base development project C18743 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: naval base development project
Context triple: [Project Seabird, instanceOf, naval base development project]
  • A. naval shipbuilding program
    A naval shipbuilding program is an organized, long-term initiative to design, construct, and deliver warships and support vessels to meet a navy’s strategic, operational, and technological requirements.
  • B. naval training base
    A naval training base is a dedicated military facility where naval personnel receive instruction, practice, and preparation in seamanship, warfare, and support operations.
  • C. naval shore establishment chosen
    A naval shore establishment is a land-based facility that supports a navy’s operations, administration, training, logistics, and maintenance away from seagoing vessels.
  • D. naval defense system
    A naval defense system is an integrated network of sensors, weapons, platforms, and command-and-control components designed to detect, deter, and neutralize maritime threats to ships, fleets, and coastal assets.
  • E. naval arsenal
    A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d393ba9c8190a8b03b04ddbb0a09 completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:50 a.m.