Triple
T18723032
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Worthing Lido |
E457827
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | seafront leisure complex |
C22985
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: seafront leisure complex Context triple: [Worthing Lido, instanceOf, seafront leisure complex]
-
A.
oceanfront complex
An oceanfront complex is a multi-building property development situated directly along the shoreline, typically featuring residential, hospitality, and recreational facilities with direct access to and views of the ocean.
-
B.
seaside facility
chosen
A seaside facility is a coastal establishment that provides services, amenities, or infrastructure for recreation, tourism, or marine-related activities along the shoreline.
-
C.
lagoon complex
A lagoon complex is an interconnected system of shallow coastal water bodies, channels, and associated landforms that together form a dynamic, semi-enclosed marine environment.
-
D.
seaside residence
A seaside residence is a home located near or directly on the coast, designed to provide convenient access to the beach and scenic ocean views.
-
E.
waterfront hotel
A waterfront hotel is a lodging establishment located directly along a body of water, offering guests immediate access to water views and related recreational activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d393ba9c8190a8b03b04ddbb0a09 |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:50 a.m.