Triple

T18711314
Position Surface form Disambiguated ID Type / Status
Subject Port of Shimonoseki E457520 entity
Predicate hasNearbyInfrastructure P231 FINISHED
Object Kanmon Tunnel NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kanmon Tunnel | Statement: [Port of Shimonoseki, hasNearbyInfrastructure, Kanmon Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kanmon Tunnel
Context triple: [Port of Shimonoseki, hasNearbyInfrastructure, Kanmon Tunnel]
  • A. Kanmon Tunnel chosen
    The Kanmon Tunnel is an undersea railway and road tunnel in Japan that links the islands of Honshu and Kyushu beneath the Kanmon Straits.
  • B. Seikan Tunnel
    The Seikan Tunnel is a 53.85-kilometer undersea railway tunnel in Japan that connects the islands of Honshu and Hokkaido beneath the Tsugaru Strait.
  • C. Omagata Tunnel
    Omagata Tunnel is a road tunnel in Kristiansund, Norway, that provides a key transport link to the island district of Nordlandet.
  • D. Tateyama Tunnel
    Tateyama Tunnel is a high-altitude mountain tunnel in Japan that forms part of the scenic Tateyama Kurobe Alpine Route through the Northern Japan Alps.
  • E. Minatojima Tunnel
    Minatojima Tunnel is an underwater road tunnel in Kobe, Japan, that connects Port Island with the mainland as part of the city's urban transport infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d392aad081909fe31aa03e6e97d1 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5671b34508190b6180f7d6ad50a58 completed April 19, 2026, 11:36 p.m.
Created at: April 10, 2026, 11:50 a.m.