Triple

T18708861
Position Surface form Disambiguated ID Type / Status
Subject Ötz E457444 entity
Predicate nearestMotorway P25934 FINISHED
Object A12 Inntal Autobahn NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A12 Inntal Autobahn | Statement: [Ötz, nearestMotorway, A12 Inntal Autobahn]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A12 Inntal Autobahn
Context triple: [Ötz, nearestMotorway, A12 Inntal Autobahn]
  • A. A12 Inntal Autobahn chosen
    The A12 Inntal Autobahn is a major Austrian motorway running through the Inn Valley, serving as a key east–west transit route between Germany and western Austria.
  • B. A8 Innkreis Autobahn
    The A8 Innkreis Autobahn is a major Austrian motorway in Upper Austria that connects the German border near Passau with the A1 West Autobahn, serving as an important international transit route.
  • C. Autobahn
    Autobahn is a track featured in the racing video game "Blueprints for the Black Market," likely inspired by Germany’s high-speed highway system.
  • D. Autobahn
    The Autobahn is Germany’s federal high-speed highway network, renowned for its extensive reach and sections without mandatory speed limits.
  • E. A13 Brenner Autobahn
    The A13 Brenner Autobahn is a major Austrian motorway that forms part of the key north–south transit route over the Alps via the Brenner Pass, linking Innsbruck toward Italy.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d392aad081909fe31aa03e6e97d1 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e56719383481909d68c9e873ca0800 completed April 19, 2026, 11:36 p.m.
Created at: April 10, 2026, 11:50 a.m.