Triple
T18700040
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | American Direct on the west face |
E457222
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | big wall route |
C6568
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: big wall route Context triple: [American Direct on the west face, instanceOf, big wall route]
-
A.
big wall rock climbing route
chosen
A big wall rock climbing route is a long, multi-pitch climb on a large cliff or rock face that typically requires advanced skills, significant time (often more than a day), and specialized gear for ascending, hauling, and sometimes overnight bivouacs.
-
B.
rock climbing route
A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
-
C.
rock face
A rock face is a steep, exposed surface of solid rock, often forming the side of a cliff, mountain, or outcrop.
-
D.
ridge climb route
A ridge climb route is a designated path that follows the crest or spine of a mountain ridge, typically involving sustained exposure and mixed climbing terrain.
-
E.
ice climbing route
An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d392aad081909fe31aa03e6e97d1 |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:49 a.m.