Triple

T18699231
Position Surface form Disambiguated ID Type / Status
Subject NH 144 E457202 entity
Predicate roadClassification P1019 FINISHED
Object National Highway (NH) NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Highway (NH) | Statement: [NH 144, roadClassification, National Highway (NH)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Highway (NH)
Context triple: [NH 144, roadClassification, National Highway (NH)]
  • A. National Route
    A National Route is a major highway in South Korea that forms part of the country’s primary, government-designated road network connecting key cities and regions.
  • B. National Highway No. 5
    National Highway No. 5 is a major Taiwanese expressway that connects the Taipei area with Yilan through extensive tunnels and mountain routes.
  • C. National Highways
    National Highways is the UK government-owned company responsible for operating, maintaining, and improving England’s motorways and major A-roads.
  • D. National Highway chosen
    A National Highway is a major public road forming part of a country’s primary highway network, designed to connect key cities, regions, and economic centers.
  • E. N-5 National Highway
    N-5 National Highway is Pakistan’s longest and most important north–south roadway, connecting Karachi with major cities across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d392aad081909fe31aa03e6e97d1 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e562ea4ee48190b18a29553371f31a completed April 19, 2026, 11:19 p.m.
Created at: April 10, 2026, 11:49 a.m.