Triple

T18685822
Position Surface form Disambiguated ID Type / Status
Subject Tamakoshi River E456858 entity
Predicate hasHydropowerProject P15311 FINISHED
Object Middle Tamakoshi Hydropower Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Middle Tamakoshi Hydropower Project | Statement: [Tamakoshi River, hasHydropowerProject, Middle Tamakoshi Hydropower Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Middle Tamakoshi Hydropower Project
Context triple: [Tamakoshi River, hasHydropowerProject, Middle Tamakoshi Hydropower Project]
  • A. Upper Tamakoshi Hydroelectric Project
    The Upper Tamakoshi Hydroelectric Project is a major run-of-the-river hydropower plant in Nepal, developed to significantly boost the country’s electricity generation capacity using the Tamakoshi River.
  • B. Lower Tamakoshi Hydropower Project
    The Lower Tamakoshi Hydropower Project is a major run-of-river hydroelectric power plant in Nepal that significantly contributes to the country’s electricity generation and energy security.
  • C. Upper Bhote Koshi Hydroelectric Project
    The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
  • D. Upper Karnali Hydropower Project
    The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
  • E. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Middle Tamakoshi Hydropower Project
Target entity description: Middle Tamakoshi Hydropower Project is a major run-of-river hydroelectric power plant in Nepal designed to generate electricity from the Tamakoshi River to support the country’s growing energy needs.
  • A. Upper Tamakoshi Hydroelectric Project
    The Upper Tamakoshi Hydroelectric Project is a major run-of-the-river hydropower plant in Nepal, developed to significantly boost the country’s electricity generation capacity using the Tamakoshi River.
  • B. Lower Tamakoshi Hydropower Project
    The Lower Tamakoshi Hydropower Project is a major run-of-river hydroelectric power plant in Nepal that significantly contributes to the country’s electricity generation and energy security.
  • C. Upper Bhote Koshi Hydroelectric Project
    The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
  • D. Upper Karnali Hydropower Project
    The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
  • E. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d391eb488190ac2e9abf5bf255e4 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e55b2c58188190b906c9ab080a76ff completed April 19, 2026, 10:46 p.m.
Created at: April 10, 2026, 11:49 a.m.