Triple

T18666371
Position Surface form Disambiguated ID Type / Status
Subject Bridgman’s View Tower (proposed) E456335 entity
Predicate instanceOf P0 FINISHED
Object proposed skyscraper C36407 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: proposed skyscraper
Context triple: [Bridgman’s View Tower (proposed), instanceOf, proposed skyscraper]
  • A. megatall skyscraper
    A megatall skyscraper is an exceptionally high-rise building exceeding 600 meters in height, designed to maximize vertical space for mixed-use functions while showcasing advanced engineering and architectural innovation.
  • B. civic skyscraper
    A civic skyscraper is a tall, prominently located high-rise building that houses public or governmental functions, symbolizing civic identity and serving as a hub for community services and administration.
  • C. super­tall building
    A supertall building is an exceptionally high skyscraper, typically exceeding 300 meters (984 feet) in height, designed to accommodate mixed uses such as offices, residences, and public spaces within a highly vertical structure.
  • D. high‑rise building chosen
    A high-rise building is a tall, multi-story structure designed to accommodate residential, commercial, or mixed-use functions, typically requiring vertical transportation systems such as elevators.
  • E. fictional skyscraper
    A fictional skyscraper is an imagined, often architecturally distinctive high-rise building that serves as a central setting or symbolic structure within a narrative world.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38f72b4819090a935175d9ca8af completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:48 a.m.