Triple
T18665961
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Perret apartment blocks |
E456324
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | postwar reconstruction project |
C33178
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: postwar reconstruction project Context triple: [Perret apartment blocks, instanceOf, postwar reconstruction project]
-
A.
post–World War II reconstruction program
A post–World War II reconstruction program is a coordinated set of policies, financial aid, and institutional reforms designed to rebuild war-torn economies, infrastructure, and governance structures while promoting long-term stability and growth.
-
B.
postwar state
A postwar state is a nation emerging from armed conflict that is engaged in reconstructing its political, economic, and social institutions while managing the legacies of war and preventing renewed violence.
-
C.
architectural reconstruction project
chosen
An architectural reconstruction project is a coordinated effort to research, design, and rebuild a damaged or lost structure to restore its historical, functional, or aesthetic integrity.
-
D.
postwar occupation
Postwar occupation is the temporary control and administration of a defeated state’s territory by foreign military or allied authorities to manage security, political transition, and reconstruction after armed conflict.
-
E.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38f72b4819090a935175d9ca8af |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:48 a.m.