Triple

T18654919
Position Surface form Disambiguated ID Type / Status
Subject Rental Car Center at Hartsfield–Jackson Atlanta International Airport E456034 entity
Predicate instanceOf P0 FINISHED
Object ground transportation hub C82 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ground transportation hub
Context triple: [Rental Car Center at Hartsfield–Jackson Atlanta International Airport, instanceOf, ground transportation hub]
  • A. ground transportation facility
    A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
  • B. transport hub chosen
    A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
  • C. combined civic building and transportation hub
    A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
  • D. transport terminal
    A transport terminal is a designated facility where passengers or goods begin, end, or transfer between different modes or routes of transportation.
  • E. public transit station
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38ea1e88190997e9b231190ba6f completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:47 a.m.