Triple

T18648930
Position Surface form Disambiguated ID Type / Status
Subject Power of Siberia E455881 entity
Predicate instanceOf P0 FINISHED
Object cross-border energy infrastructure project C40846 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-border energy infrastructure project
Context triple: [Power of Siberia, instanceOf, cross-border energy infrastructure project]
  • A. electricity interconnector
    An electricity interconnector is a high-capacity transmission link that connects the power grids of different regions or countries, enabling cross-border exchange of electrical energy.
  • B. cross-border institution
    A cross-border institution is an organization or entity that operates across national boundaries, coordinating policies, activities, or services between multiple countries or jurisdictions.
  • C. HVDC interconnector
    An HVDC interconnector is a high-voltage direct current transmission link that connects separate power grids or regions to enable efficient long-distance electricity transfer and cross-border energy exchange.
  • D. cross-Channel transport infrastructure
    Cross-Channel transport infrastructure encompasses the physical and operational systems—such as tunnels, ports, terminals, and associated logistics facilities—that enable the movement of people and goods between the UK and mainland Europe across the English Channel.
  • E. cross-border investment channel
    A cross-border investment channel is a structured mechanism or platform that enables the flow of capital between investors and assets located in different countries, while managing regulatory, currency, and operational complexities.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38ea1e88190997e9b231190ba6f completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:47 a.m.