Triple

T18648249
Position Surface form Disambiguated ID Type / Status
Subject Brierfield Furnace E455859 entity
Predicate hasFunctionStatus P100613 FINISHED
Object no longer in operation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: no longer in operation | Statement: [Brierfield Furnace, hasFunctionStatus, no longer in operation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasFunctionStatus
Context triple: [Brierfield Furnace, hasFunctionStatus, no longer in operation]
  • A. hasFunctionInWork
    Indicates that an entity serves a specific role or performs a particular function within a given work (such as a creative, scholarly, or technical work).
  • B. hasFunctionInPresent
    Indicates that an entity currently performs, exhibits, or fulfills a specific function or role at the present time.
  • C. hasFeatureStatus chosen
    Indicates that an entity possesses a particular feature along with its current state or condition.
  • D. hasServiceFunction
    Indicates that an entity performs, provides, or is responsible for a particular service-related function or role.
  • E. hasHubFunction
    Indicates that an entity serves as a central hub or coordinating point for certain activities, connections, or functions within a system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38ea1e88190997e9b231190ba6f completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5500f007c81908b1835569be913d7 completed April 19, 2026, 9:58 p.m.
PD Predicate disambiguation batch_69e478d85864819093cbad5ed9b54878 completed April 19, 2026, 6:40 a.m.
Created at: April 10, 2026, 11:47 a.m.