Triple

T18642513
Position Surface form Disambiguated ID Type / Status
Subject 2016 Kellogg's Tour of Gymnastics Champions E455724 entity
Predicate instanceOf P0 FINISHED
Object post-Olympic tour C40833 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: post-Olympic tour
Context triple: [2016 Kellogg's Tour of Gymnastics Champions, instanceOf, post-Olympic tour]
  • A. Olympic legacy plan
    An Olympic legacy plan is a strategic framework designed to ensure that the long-term social, economic, environmental, and infrastructural benefits of hosting the Olympic Games are realized and sustained for the host city and nation.
  • B. stadium tour
    A stadium tour is a guided experience that takes visitors behind the scenes of a sports or entertainment venue, showcasing areas such as locker rooms, VIP suites, and the playing field while sharing the venue’s history and operations.
  • C. Olympic sponsorship programme
    An Olympic sponsorship programme is a structured initiative through which companies provide financial or in-kind support to the Olympic Games in exchange for exclusive marketing rights, brand association, and global promotional opportunities.
  • D. Grand Tour
    A Grand Tour is an extended, often multi-destination journey undertaken for cultural enrichment, education, and personal growth through immersive travel experiences.
  • E. Olympic Games promotional campaign
    An Olympic Games promotional campaign is a coordinated set of marketing and communication activities designed to build global awareness, excitement, and engagement around the upcoming Olympic Games, its host city, athletes, and values.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38ea1e88190997e9b231190ba6f completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:47 a.m.