Triple
T18630327
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Onchan Raceway |
E455397
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | stock car racing circuit |
C37542
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: stock car racing circuit Context triple: [Onchan Raceway, instanceOf, stock car racing circuit]
-
A.
racing circuit
chosen
A racing circuit is a purpose-built or adapted closed course featuring straights, curves, and safety infrastructure where competitive motor or bicycle races are held.
-
B.
stock car race
A stock car race is a high-speed motorsport competition where modified production-based cars compete on oval or road tracks to complete a set distance or number of laps in the shortest time.
-
C.
auto racing track
An auto racing track is a specialized, closed-circuit roadway designed with specific layouts, surfaces, and safety features to facilitate competitive automobile racing events.
-
D.
Formula One circuit
A Formula One circuit is a specialized racing track, either permanent or temporary, designed and certified to host Formula One Grand Prix events, featuring complex layouts, safety features, and facilities for teams, officials, and spectators.
-
E.
stock car racing series
A stock car racing series is an organized competition featuring multiple events where drivers race modified production-based cars under a common rule set across a season to determine overall champions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38cc7948190a55ea64e5638994e |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:46 a.m.