Triple

T18622457
Position Surface form Disambiguated ID Type / Status
Subject Marmande station E455188 entity
Predicate isOnRoute P2127 FINISHED
Object Bordeaux – Agen corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bordeaux – Agen corridor | Statement: [Marmande station, isOnRoute, Bordeaux – Agen corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bordeaux – Agen corridor
Context triple: [Marmande station, isOnRoute, Bordeaux – Agen corridor]
  • A. Tours–Bordeaux corridor
    The Tours–Bordeaux corridor is a major high-speed rail axis in western France that connects the Loire Valley region around Tours with the city of Bordeaux, forming a key link in the country’s north–south rail network.
  • B. Bordeaux ring road
    The Bordeaux ring road is a major orbital highway encircling the city of Bordeaux, France, connecting several national and regional motorways and helping to divert through-traffic away from the city center.
  • C. Lyon–Rhône corridor
    The Lyon–Rhône corridor is a major inland waterway route in France that links the city of Lyon to the Rhône River, facilitating north–south freight and passenger transport between central Europe and the Mediterranean.
  • D. Bordeaux tramway network
    The Bordeaux tramway network is a modern light rail system serving the city of Bordeaux and its suburbs in southwestern France, known for its extensive coverage and ground-level power supply technology in the historic center.
  • E. Paris–Normandy corridor
    The Paris–Normandy corridor is a major French transport axis linking the Paris region with the ports and cities of Normandy, serving as a key route for both passenger and freight traffic.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Bordeaux – Agen corridor
Target entity description: The Bordeaux–Agen corridor is a key regional railway line in southwestern France that connects the city of Bordeaux with Agen, serving intermediate towns such as Marmande.
  • A. Tours–Bordeaux corridor
    The Tours–Bordeaux corridor is a major high-speed rail axis in western France that connects the Loire Valley region around Tours with the city of Bordeaux, forming a key link in the country’s north–south rail network.
  • B. Bordeaux ring road
    The Bordeaux ring road is a major orbital highway encircling the city of Bordeaux, France, connecting several national and regional motorways and helping to divert through-traffic away from the city center.
  • C. Lyon–Rhône corridor
    The Lyon–Rhône corridor is a major inland waterway route in France that links the city of Lyon to the Rhône River, facilitating north–south freight and passenger transport between central Europe and the Mediterranean.
  • D. Bordeaux tramway network
    The Bordeaux tramway network is a modern light rail system serving the city of Bordeaux and its suburbs in southwestern France, known for its extensive coverage and ground-level power supply technology in the historic center.
  • E. Paris–Normandy corridor
    The Paris–Normandy corridor is a major French transport axis linking the Paris region with the ports and cities of Normandy, serving as a key route for both passenger and freight traffic.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38cc7948190a55ea64e5638994e completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e54f020fa08190bd78d72182496b19 completed April 19, 2026, 9:54 p.m.
Created at: April 10, 2026, 11:46 a.m.