Triple

T18616125
Position Surface form Disambiguated ID Type / Status
Subject Talwara E455024 entity
Predicate near P350 FINISHED
Object Pong Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pong Dam | Statement: [Talwara, near, Pong Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pong Dam
Context triple: [Talwara, near, Pong Dam]
  • A. Pong Dam chosen
    Pong Dam is a large embankment dam in Himachal Pradesh, India, primarily built for irrigation, flood control, and hydroelectric power generation on the Beas River.
  • B. Pubugou Dam
    Pubugou Dam is a large hydroelectric gravity dam in Sichuan, China, known for its significant power generation capacity and its role in flood control and regional development along the Dadu River.
  • C. Pracana Dam
    Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
  • D. Gouin Dam
    Gouin Dam is a major hydroelectric dam in Quebec, Canada, that creates the vast Gouin Reservoir and plays a key role in regional power generation and water regulation.
  • E. Tilaiya Dam
    Tilaiya Dam is a multipurpose masonry dam in Jharkhand, India, built as part of the Damodar Valley Corporation project to provide hydroelectric power, irrigation, and flood control.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38bbe7c8190bdec3138e7d413c9 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e54d05da9c8190b8f4ef3a7a6deb05 completed April 19, 2026, 9:45 p.m.
Created at: April 10, 2026, 11:46 a.m.