Triple
T18606416
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | East Derry |
E454762
|
entity |
| Predicate | roadAccessVia |
P9041
|
FINISHED |
| Object | New Hampshire Route 28B |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New Hampshire Route 28B | Statement: [East Derry, roadAccessVia, New Hampshire Route 28B]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: New Hampshire Route 28B Context triple: [East Derry, roadAccessVia, New Hampshire Route 28B]
-
A.
New Hampshire Route 28
New Hampshire Route 28 is a major north–south state highway running through central and southern New Hampshire, linking several communities and serving as a key regional travel corridor.
-
B.
New Hampshire Route 27
New Hampshire Route 27 is an east–west state highway in southeastern New Hampshire that connects several communities, including the town of Exeter, and serves as a regional arterial route.
-
C.
New Hampshire Route 25
New Hampshire Route 25 is an east–west state highway that traverses central New Hampshire, connecting several towns and serving as a key regional route between the Lakes Region and the western part of the state.
-
D.
New Hampshire Route 38
New Hampshire Route 38 is a state highway in southern New Hampshire that serves as a key local connector through Salem and surrounding communities.
-
E.
New Hampshire Route 236
New Hampshire Route 236 is a short state highway in southeastern New Hampshire that serves as a key connector through the city of Somersworth near the Maine border.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: New Hampshire Route 28B Target entity description: New Hampshire Route 28B is a short state highway in southern New Hampshire that serves as a local connector route in the Derry area.
-
A.
New Hampshire Route 28
New Hampshire Route 28 is a major north–south state highway running through central and southern New Hampshire, linking several communities and serving as a key regional travel corridor.
-
B.
New Hampshire Route 27
New Hampshire Route 27 is an east–west state highway in southeastern New Hampshire that connects several communities, including the town of Exeter, and serves as a regional arterial route.
-
C.
New Hampshire Route 25
New Hampshire Route 25 is an east–west state highway that traverses central New Hampshire, connecting several towns and serving as a key regional route between the Lakes Region and the western part of the state.
-
D.
New Hampshire Route 38
New Hampshire Route 38 is a state highway in southern New Hampshire that serves as a key local connector through Salem and surrounding communities.
-
E.
New Hampshire Route 236
New Hampshire Route 236 is a short state highway in southeastern New Hampshire that serves as a key connector through the city of Somersworth near the Maine border.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38bbe7c8190bdec3138e7d413c9 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e547544a248190a3465e22dfb29305 |
completed | April 19, 2026, 9:21 p.m. |
Created at: April 10, 2026, 11:45 a.m.