Triple
T18587769
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SpaceX CRS-9 |
E454281
|
entity |
| Predicate | issProgram |
P132684
|
FINISHED |
| Object | International Space Station program |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: International Space Station program | Statement: [SpaceX CRS-9, issProgram, International Space Station program]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: International Space Station program Context triple: [SpaceX CRS-9, issProgram, International Space Station program]
-
A.
International Space Station program
chosen
The International Space Station program is a multinational collaborative effort to design, build, and operate a permanently crewed orbital research laboratory in low Earth orbit.
-
B.
Space Station Freedom program
The Space Station Freedom program was a canceled NASA-led initiative from the 1980s–1990s to build a permanently crewed U.S. space station in low Earth orbit, whose plans and technologies were later folded into the International Space Station.
-
C.
International Space Station
The International Space Station is a permanently crewed modular space laboratory in low Earth orbit that serves as a multinational research facility and technology testbed.
-
D.
International Space Station expedition
The International Space Station expedition is a long-duration mission program in which rotating crews of astronauts and cosmonauts live and work aboard the ISS to conduct scientific research and maintain the orbiting laboratory.
-
E.
Shuttle–Mir Program
The Shuttle–Mir Program was a collaborative U.S.–Russian space initiative in the 1990s that docked American Space Shuttles with the Russian Mir space station to advance long-duration human spaceflight and foster post–Cold War cooperation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: issProgram Context triple: [SpaceX CRS-9, issProgram, International Space Station program]
-
A.
madeProgram
Indicates that one entity created, developed, or authored a program (such as software or a coded application).
-
B.
intendedProgram
Indicates the academic or training program that an entity plans or expects to pursue, rather than one they are currently enrolled in or have completed.
-
C.
stateProgram
Indicates that a program is organized, funded, or administered by a governmental state authority.
-
D.
implementedProgram
Indicates that an entity has created, developed, or put into operation a particular program or software system.
-
E.
sisterProgram
Indicates that two programs are related as counterparts or partners, typically sharing similar goals, structures, or affiliations within an organization or system.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38ae7e081908a98df1251842402 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e545b2f20481908da74447cd08d5bd |
completed | April 19, 2026, 9:14 p.m. |
| PD | Predicate disambiguation | batch_69e478c98d4c81909d37a0e72c6e7bd0 |
completed | April 19, 2026, 6:40 a.m. |
| PDg | Predicate description generation | batch_69e484121cd48190bf583b4c94636a30 |
completed | April 19, 2026, 7:28 a.m. |
Created at: April 10, 2026, 11:44 a.m.