Triple
T18587644
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IDA |
E454279
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | International Docking Adapter |
C10281
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: International Docking Adapter Context triple: [IDA, instanceOf, International Docking Adapter]
-
A.
Space Shuttle payload module
A Space Shuttle payload module is a specialized, modular structure designed to house, support, and interface scientific instruments, cargo, or satellites within the Shuttle’s payload bay for deployment or on-orbit operations.
-
B.
spacecraft docking system
chosen
A spacecraft docking system is a coordinated assembly of mechanical interfaces, sensors, and control software that enables two spacecraft to safely approach, align, and connect in orbit for transfer of crew, cargo, or resources.
-
C.
Long Duration Propulsive EELV Secondary Payload Adapter mission
A Long Duration Propulsive EELV Secondary Payload Adapter mission is a spaceflight that uses a propulsive ESPA ring on an Evolved Expendable Launch Vehicle to carry and operate secondary payloads for extended periods in space, providing independent maneuvering and mission flexibility separate from the primary payload.
-
D.
spacecraft service module
A spacecraft service module is the section of a spacecraft that houses and provides essential support systems—such as propulsion, power, thermal control, and consumables—to enable and sustain the operation of the crew or payload module.
-
E.
spacecraft payload adapter
A spacecraft payload adapter is a structural interface that securely connects a satellite or payload to the launch vehicle, ensuring proper alignment, load transfer, and separation during ascent and deployment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38ae7e081908a98df1251842402 |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:44 a.m.