Triple

T1857419
Position Surface form Disambiguated ID Type / Status
Subject Croton Water Filtration Plant E41735 entity
Predicate instanceOf P0 FINISHED
Object underground facility C4955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: underground facility
Context triple: [Croton Water Filtration Plant, instanceOf, underground facility]
  • A. underground structure chosen
    An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
  • B. cavern hall
    A cavern hall is a vast, naturally formed underground chamber characterized by high ceilings, expansive open space, and geological features such as stalactites, stalagmites, and rock formations.
  • C. floor of a building
    A floor of a building is a horizontal structural level designed to support occupants and activities, typically bounded vertically by ceilings and/or other floors.
  • D. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • E. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8864a83848190a4ec02721306c511 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:33 p.m.