Triple

T18566545
Position Surface form Disambiguated ID Type / Status
Subject IFRS 7 Financial Instruments: Disclosures E453772 entity
Predicate effectiveForAnnualPeriodsBeginningOnOrAfter P132554 FINISHED
Object 2007-01-01 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2007-01-01 | Statement: [IFRS 7 Financial Instruments: Disclosures, effectiveForAnnualPeriodsBeginningOnOrAfter, 2007-01-01]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: effectiveForAnnualPeriodsBeginningOnOrAfter
Context triple: [IFRS 7 Financial Instruments: Disclosures, effectiveForAnnualPeriodsBeginningOnOrAfter, 2007-01-01]
  • A. effectivePeriodStart
    Indicates the date and time when a specified condition, status, or agreement becomes valid or goes into effect.
  • B. effectiveForPaymentsMadeAfter
    Indicates that a condition, rule, or agreement applies only to payments that are made after a specified time or event.
  • C. effectiveYear
    Indicates the calendar year in which something (such as a rule, status, or agreement) becomes valid or takes effect.
  • D. effectiveFor
    Indicates that one entity successfully produces the intended effect, benefit, or desired outcome for another entity or condition.
  • E. eligibilityPeriodStartYear
    Indicates the calendar year in which an entity’s eligibility period begins.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38974308190a9174430ef256b73 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e53aff027481909ca7257967967650 completed April 19, 2026, 8:28 p.m.
PD Predicate disambiguation batch_69e478c16e0c8190b03966aa23c395a6 completed April 19, 2026, 6:40 a.m.
PDg Predicate description generation batch_69e484121cd48190bf583b4c94636a30 completed April 19, 2026, 7:28 a.m.
Created at: April 10, 2026, 11:43 a.m.