Triple
T1855222
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Central Embankment of the Volga |
E41686
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | riverside promenade |
C6461
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: riverside promenade Context triple: [Central Embankment of the Volga, instanceOf, riverside promenade]
-
A.
urban promenade
chosen
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
-
B.
Royal Park
A Royal Park is a large, formally designated public green space historically associated with a monarchy, preserved for recreation, leisure, and ceremonial or cultural events.
-
C.
waterfront district
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
D.
waterfront pier complex
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
E.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8864a83848190a4ec02721306c511 |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:33 p.m.