Triple
T18537992
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Layer Pyramid at Zawyet el-Aryan |
E453015
|
entity |
| Predicate | coreConstruction |
P120949
|
FINISHED |
| Object | horizontal stone layers |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: horizontal stone layers | Statement: [Layer Pyramid at Zawyet el-Aryan, coreConstruction, horizontal stone layers]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: coreConstruction Context triple: [Layer Pyramid at Zawyet el-Aryan, coreConstruction, horizontal stone layers]
-
A.
coreConstruct
chosen
Indicates a fundamental building or organizing relationship where one entity serves as the essential basis or primary component from which another entity is formed or structured.
-
B.
constructionBase
Indicates that one entity serves as the foundational structure or base upon which another entity is constructed or built.
-
C.
constructs
Indicates that an agent builds, creates, or assembles something, typically resulting in a new or more complex entity or structure.
-
D.
constructionReignOf
Indicates that a construction activity or project occurred during the reign or rule of a particular authority or leader.
-
E.
combinedConstruction
Indicates that multiple construction elements, processes, or projects are joined or executed together as a single combined construction activity.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d387b5548190aa030dad2cb4947e |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e534030bd88190b25b95305a12a0c1 |
completed | April 19, 2026, 7:58 p.m. |
| PD | Predicate disambiguation | batch_69e469e0025c81908f16ed4f922674af |
completed | April 19, 2026, 5:36 a.m. |
Created at: April 10, 2026, 11:37 a.m.