Triple

T18537913
Position Surface form Disambiguated ID Type / Status
Subject Khaba E453013 entity
Predicate buildingActivityStatus P38811 FINISHED
Object limited evidence LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: limited evidence | Statement: [Khaba, buildingActivityStatus, limited evidence]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: buildingActivityStatus
Context triple: [Khaba, buildingActivityStatus, limited evidence]
  • A. hasBuildingStatus chosen
    Indicates the current condition, classification, or operational state assigned to a building.
  • B. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • C. buildingInvolved
    Indicates that a particular building participates in, is affected by, or is otherwise relevant to the specified event or relationship.
  • D. involvesConstructionActivity
    Indicates that an entity is engaged in, associated with, or includes some form of construction-related work or activity.
  • E. buildingCondition
    Indicates the physical state or quality of a building, such as how well it is preserved, maintained, or structurally sound.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d387b5548190aa030dad2cb4947e completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e534030bd88190b25b95305a12a0c1 completed April 19, 2026, 7:58 p.m.
PD Predicate disambiguation batch_69e469e0025c81908f16ed4f922674af completed April 19, 2026, 5:36 a.m.
Created at: April 10, 2026, 11:37 a.m.