Triple

T18529417
Position Surface form Disambiguated ID Type / Status
Subject Laravel Valet E452796 entity
Predicate instanceOf P0 FINISHED
Object PHP development tool C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: PHP development tool
Context triple: [Laravel Valet, instanceOf, PHP development tool]
  • A. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • B. database development tool
    A database development tool is a software application that helps developers design, build, manage, and optimize databases through features like schema modeling, query editing, debugging, and performance analysis.
  • C. collection of programming tools
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • D. Web technology suite
    A web technology suite is an integrated collection of tools, frameworks, and protocols used to design, develop, deploy, and manage web applications and services.
  • E. .NET development platform component
    A .NET development platform component is a modular building block—such as a library, runtime, or tooling element—that integrates into the .NET ecosystem to provide specific functionality for building, running, or managing .NET applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d387b5548190aa030dad2cb4947e completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:37 a.m.