Triple

T18529368
Position Surface form Disambiguated ID Type / Status
Subject Laravel Sail E452795 entity
Predicate instanceOf P0 FINISHED
Object Laravel development tool C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Laravel development tool
Context triple: [Laravel Sail, instanceOf, Laravel development tool]
  • A. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • B. database development tool
    A database development tool is a software application that helps developers design, build, manage, and optimize databases through features like schema modeling, query editing, debugging, and performance analysis.
  • C. low-code development platform
    A low-code development platform is a software environment that enables users to build applications quickly with minimal hand-coding by using visual interfaces, prebuilt components, and configuration-driven logic.
  • D. no-code application development platform
    A no-code application development platform is a software environment that enables users to design, build, and deploy applications through visual interfaces and prebuilt components without writing traditional programming code.
  • E. front-end build tool
    A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d387b5548190aa030dad2cb4947e completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:37 a.m.