Triple

T18524288
Position Surface form Disambiguated ID Type / Status
Subject J.C. Boyle Dam E452673 entity
Predicate ownedBy P347 FINISHED
Object PacifiCorp NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PacifiCorp | Statement: [J.C. Boyle Dam, ownedBy, PacifiCorp]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PacifiCorp
Context triple: [J.C. Boyle Dam, ownedBy, PacifiCorp]
  • A. PacifiCorp chosen
    PacifiCorp is a major U.S. electric utility company serving customers across several Western states.
  • B. Idaho Power Company
    Idaho Power Company is a U.S. electric utility based in the Pacific Northwest, known for generating and distributing hydroelectric power along the Snake River and surrounding regions.
  • C. Evergy
    Evergy is a major electric utility company serving customers primarily in Kansas and Missouri.
  • D. Bonneville Power Administration
    Bonneville Power Administration is a U.S. federal agency that markets and transmits electric power, primarily from hydroelectric dams in the Pacific Northwest.
  • E. Great Western Power Company
    Great Western Power Company was an early 20th-century California electric utility company known for developing hydroelectric projects and infrastructure in the Sierra Nevada region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d387b5548190aa030dad2cb4947e completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e533908b0c81908725baf828aa46ff completed April 19, 2026, 7:57 p.m.
Created at: April 10, 2026, 11:37 a.m.