Triple
T18516670
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Idaho State Highway 33 |
E452482
|
entity |
| Predicate | westernTerminus |
P388
|
FINISHED |
| Object | U.S. Route 20 near Arco, Idaho |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 20 near Arco, Idaho | Statement: [Idaho State Highway 33, westernTerminus, U.S. Route 20 near Arco, Idaho]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 20 near Arco, Idaho Context triple: [Idaho State Highway 33, westernTerminus, U.S. Route 20 near Arco, Idaho]
-
A.
U.S. Route 20 in Boise
U.S. Route 20 in Boise is a major east–west U.S. Highway segment that serves as a primary arterial route through the Boise, Idaho metropolitan area.
-
B.
U.S. Route 20 near Rockwell City, Iowa
U.S. Route 20 near Rockwell City, Iowa is a major east–west federal highway segment in north-central Iowa that serves as an important regional connector for communities and intersecting state routes such as Iowa Highway 10.
-
C.
U.S. Route 26 in Boise
U.S. Route 26 in Boise is a major east–west federal highway corridor that passes through the city, connecting it to other key routes and regions in Idaho and beyond.
-
D.
U.S. Route 20 in Bend
U.S. Route 20 in Bend is a major east–west highway corridor running through Bend, Oregon, serving as a key route for regional travel and access to Central Oregon.
-
E.
U.S. Route 20 near Waterloo, Iowa
U.S. Route 20 near Waterloo, Iowa is a major east–west highway segment in northeastern Iowa that serves the Waterloo–Cedar Falls area and connects with several key regional routes.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 20 near Arco, Idaho Target entity description: U.S. Route 20 near Arco, Idaho is a segment of the transcontinental U.S. Highway 20 that passes by the small town of Arco in eastern Idaho, serving as a key regional route connecting local highways and nearby rural communities.
-
A.
U.S. Route 20 in Boise
U.S. Route 20 in Boise is a major east–west U.S. Highway segment that serves as a primary arterial route through the Boise, Idaho metropolitan area.
-
B.
U.S. Route 20 near Rockwell City, Iowa
U.S. Route 20 near Rockwell City, Iowa is a major east–west federal highway segment in north-central Iowa that serves as an important regional connector for communities and intersecting state routes such as Iowa Highway 10.
-
C.
U.S. Route 26 in Boise
U.S. Route 26 in Boise is a major east–west federal highway corridor that passes through the city, connecting it to other key routes and regions in Idaho and beyond.
-
D.
U.S. Route 20 in Bend
U.S. Route 20 in Bend is a major east–west highway corridor running through Bend, Oregon, serving as a key route for regional travel and access to Central Oregon.
-
E.
U.S. Route 20 near Waterloo, Iowa
U.S. Route 20 near Waterloo, Iowa is a major east–west highway segment in northeastern Iowa that serves the Waterloo–Cedar Falls area and connects with several key regional routes.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d386df84819092355ebb260d848e |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e5338b2cd0819095db59f6bfc70814 |
completed | April 19, 2026, 7:56 p.m. |
Created at: April 10, 2026, 11:36 a.m.