Triple

T18502061
Position Surface form Disambiguated ID Type / Status
Subject Corning Gorilla Glass DX+ E452099 entity
Predicate instanceOf P0 FINISHED
Object glass composite material C17002 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: glass composite material
Context triple: [Corning Gorilla Glass DX+, instanceOf, glass composite material]
  • A. glassworks
    A glassworks is a facility where raw materials are melted, shaped, and finished into glass products such as bottles, windows, and decorative items.
  • B. iron-and-glass structure
    An iron-and-glass structure is a building or architectural framework that uses iron elements for support and large expanses of glass for walls or roofing, creating open, light-filled interior spaces.
  • C. glass model collection
    A glass model collection is an assemblage of intricately crafted glass representations of objects, organisms, or concepts, curated for artistic, educational, or scientific appreciation.
  • D. Gorilla Glass product chosen
    A Gorilla Glass product is a durable, chemically strengthened glass component designed to protect electronic device displays and surfaces from scratches, impacts, and everyday wear.
  • E. wrought-iron and glass structure
    A wrought-iron and glass structure is an architectural framework that uses forged iron elements to support expansive glass surfaces, creating strong yet visually light enclosures that maximize transparency and natural light.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d3855d50819097fc8561b0299dd9 completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:36 a.m.