Triple
T18501485
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Libero tariff association |
E452080
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public transport organisation in Switzerland |
C38826
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public transport organisation in Switzerland Context triple: [Libero tariff association, instanceOf, public transport organisation in Switzerland]
-
A.
transport association in Switzerland
chosen
A transport association in Switzerland is a regional organization that coordinates and integrates public transportation services, fares, and timetables across multiple operators within a defined area to provide seamless mobility for passengers.
-
B.
transportation organization
A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
-
C.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
D.
private railway company
A private railway company is a non-governmental business entity that owns, operates, or manages rail transport services for passengers and/or freight, typically for profit under regulatory oversight.
-
E.
Swiss federal commission
A Swiss federal commission is an expert advisory body appointed by the Swiss federal government to provide specialized guidance, prepare reports, and support decision-making in specific policy areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d3855d50819097fc8561b0299dd9 |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:36 a.m.