Triple

T18497718
Position Surface form Disambiguated ID Type / Status
Subject APAS-89 E451991 entity
Predicate instanceOf P0 FINISHED
Object androgynous peripheral attach system C37247 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: androgynous peripheral attach system
Context triple: [APAS-89, instanceOf, androgynous peripheral attach system]
  • A. docking port chosen
    A docking port is a specialized interface on a spacecraft or space station that enables secure physical connection, alignment, and transfer of power, data, and crew or cargo between two vehicles.
  • B. spacecraft payload adapter
    A spacecraft payload adapter is a structural interface that securely connects a satellite or payload to the launch vehicle, ensuring proper alignment, load transfer, and separation during ascent and deployment.
  • C. portable bridge system
    A portable bridge system is a modular, transportable structure designed to be rapidly deployed and assembled to provide temporary or emergency crossing over obstacles such as rivers, gaps, or damaged infrastructure.
  • D. parallel computer bus
    A parallel computer bus is a communication system that transfers multiple bits of data simultaneously across multiple wires or channels between components within a computer system.
  • E. magnetic power connector
    A magnetic power connector is a plug-and-socket interface that uses magnetic attraction to align and hold the power connection securely while allowing easy, low-force attachment and detachment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d3855d50819097fc8561b0299dd9 completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:36 a.m.