Triple
T18497635
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PMM Leonardo |
E451988
|
entity |
| Predicate | reconfiguredBetweenMissions |
P103911
|
FINISHED |
| Object | STS-131 and STS-133 |
—
|
NE NERFINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-131 and STS-133 | Statement: [PMM Leonardo, reconfiguredBetweenMissions, STS-131 and STS-133]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-131 and STS-133 Context triple: [PMM Leonardo, reconfiguredBetweenMissions, STS-131 and STS-133]
-
A.
STS-131
STS-131 was a 2010 Space Shuttle Discovery mission to the International Space Station focused on delivering supplies, equipment, and science experiments.
-
B.
STS-133
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
-
C.
STS-134
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
-
D.
STS-130
STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
-
E.
STS-132
STS-132 was a 2010 NASA Space Shuttle Atlantis mission to the International Space Station that delivered the Russian Rassvet module and marked Atlantis’s final planned flight.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: STS-131 and STS-133 Target entity description: STS-131 and STS-133 were NASA Space Shuttle missions to the International Space Station that included major logistics and module-related work, including flights involving the Permanent Multipurpose Module Leonardo.
-
A.
STS-131
STS-131 was a 2010 Space Shuttle Discovery mission to the International Space Station focused on delivering supplies, equipment, and science experiments.
-
B.
STS-133
chosen
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
-
C.
STS-134
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
-
D.
STS-130
STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
-
E.
STS-132
STS-132 was a 2010 NASA Space Shuttle Atlantis mission to the International Space Station that delivered the Russian Rassvet module and marked Atlantis’s final planned flight.
- F. None of above.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: reconfiguredBetweenMissions Context triple: [PMM Leonardo, reconfiguredBetweenMissions, STS-131 and STS-133]
-
A.
wasReconfiguredIn
chosen
Indicates that an entity underwent a change in its configuration or setup during a specified time or event.
-
B.
missionConfiguration
Indicates the specific setup, parameters, and conditions under which a mission is planned or executed.
-
C.
removedDuringMission
Indicates that an entity was taken away, detached, or eliminated while a mission or operation was in progress.
-
D.
tacticalChange
Indicates a deliberate adjustment in strategy, methods, or actions made to improve effectiveness in a specific situation or operation.
-
E.
operatedOnMission
Indicates that an agent carried out or participated in the execution of a specific mission.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d3855d50819097fc8561b0299dd9 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e532c15dec8190941e7c7a4cdebb66 |
completed | April 19, 2026, 7:53 p.m. |
| PD | Predicate disambiguation | batch_69e469dbf5208190b6fc49e02a087f54 |
completed | April 19, 2026, 5:36 a.m. |
Created at: April 10, 2026, 11:36 a.m.