Triple

T18481507
Position Surface form Disambiguated ID Type / Status
Subject ASFINAG E451570 entity
Predicate hasSubsidiary P254 FINISHED
Object ASFINAG Alpenstraßen GmbH NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ASFINAG Alpenstraßen GmbH | Statement: [ASFINAG, hasSubsidiary, ASFINAG Alpenstraßen GmbH]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ASFINAG Alpenstraßen GmbH
Context triple: [ASFINAG, hasSubsidiary, ASFINAG Alpenstraßen GmbH]
  • A. ASFINAG
    ASFINAG is the Austrian state-owned company responsible for planning, building, financing, and operating the country's motorway and expressway network.
  • B. Austrian motorway operator ASFINAG
    Austrian motorway operator ASFINAG is a state-owned company responsible for planning, financing, building, operating, and maintaining Austria’s motorways and expressways.
  • C. Großglockner Hochalpenstraßen AG
    Großglockner Hochalpenstraßen AG is an Austrian company responsible for operating and managing the scenic Grossglockner High Alpine Road and related tourism infrastructure in the region.
  • D. AlpTransit Gotthard AG
    AlpTransit Gotthard AG is a Swiss project company responsible for planning and constructing major transalpine railway base tunnels, including key segments of the New Railway Link through the Alps.
  • E. Linzer Linien
    Linzer Linien is the public transport operator responsible for managing tram and bus services in the Austrian city of Linz.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: ASFINAG Alpenstraßen GmbH
Target entity description: ASFINAG Alpenstraßen GmbH is an Austrian company responsible for operating and maintaining alpine motorways and expressways within the ASFINAG highway network.
  • A. ASFINAG chosen
    ASFINAG is the Austrian state-owned company responsible for planning, building, financing, and operating the country's motorway and expressway network.
  • B. Austrian motorway operator ASFINAG
    Austrian motorway operator ASFINAG is a state-owned company responsible for planning, financing, building, operating, and maintaining Austria’s motorways and expressways.
  • C. Großglockner Hochalpenstraßen AG
    Großglockner Hochalpenstraßen AG is an Austrian company responsible for operating and managing the scenic Grossglockner High Alpine Road and related tourism infrastructure in the region.
  • D. AlpTransit Gotthard AG
    AlpTransit Gotthard AG is a Swiss project company responsible for planning and constructing major transalpine railway base tunnels, including key segments of the New Railway Link through the Alps.
  • E. Linzer Linien
    Linzer Linien is the public transport operator responsible for managing tram and bus services in the Austrian city of Linz.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38465a0819099b9b42d2a662ac1 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e531d3d13c81909c52d797360b840a completed April 19, 2026, 7:49 p.m.
Created at: April 10, 2026, 11:35 a.m.