Triple

T18481438
Position Surface form Disambiguated ID Type / Status
Subject Austrian Autobahn network E451568 entity
Predicate hasPart P35 FINISHED
Object A27 Linzer Autobahn (planned or partial) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A27 Linzer Autobahn (planned or partial) | Statement: [Austrian Autobahn network, hasPart, A27 Linzer Autobahn (planned or partial)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A27 Linzer Autobahn (planned or partial)
Context triple: [Austrian Autobahn network, hasPart, A27 Linzer Autobahn (planned or partial)]
  • A. A22 Donauufer Autobahn
    The A22 Donauufer Autobahn is a major Austrian motorway running along the Danube in Vienna, serving as an important urban and regional traffic artery.
  • B. A10 Tauern Autobahn
    The A10 Tauern Autobahn is a major Austrian motorway running through the Alps, forming a key north–south transit route between Salzburg and Carinthia.
  • C. A4 motorway (Austria)
    The A4 motorway in Austria, also known as the Ost Autobahn, is a major east–west highway linking Vienna to the Hungarian border near Nickelsdorf and serving as a key route toward Eastern Europe.
  • D. Austrian Autobahn network
    The Austrian Autobahn network is a nationwide system of high-speed motorways that connects major cities and regions across Austria and links the country to neighboring European states.
  • E. S6 Semmering Schnellstraße
    The S6 Semmering Schnellstraße is an Austrian expressway that forms a key east–west transit route through the Alps, linking the Vienna region with Styria via the historic Semmering area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A27 Linzer Autobahn (planned or partial)
Target entity description: The A27 Linzer Autobahn is a planned or partially built motorway intended to serve the Linz area as part of Austria’s federal Autobahn network.
  • A. A22 Donauufer Autobahn
    The A22 Donauufer Autobahn is a major Austrian motorway running along the Danube in Vienna, serving as an important urban and regional traffic artery.
  • B. A10 Tauern Autobahn
    The A10 Tauern Autobahn is a major Austrian motorway running through the Alps, forming a key north–south transit route between Salzburg and Carinthia.
  • C. A4 motorway (Austria)
    The A4 motorway in Austria, also known as the Ost Autobahn, is a major east–west highway linking Vienna to the Hungarian border near Nickelsdorf and serving as a key route toward Eastern Europe.
  • D. Austrian Autobahn network
    The Austrian Autobahn network is a nationwide system of high-speed motorways that connects major cities and regions across Austria and links the country to neighboring European states.
  • E. S6 Semmering Schnellstraße
    The S6 Semmering Schnellstraße is an Austrian expressway that forms a key east–west transit route through the Alps, linking the Vienna region with Styria via the historic Semmering area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38465a0819099b9b42d2a662ac1 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e531d3d13c81909c52d797360b840a completed April 19, 2026, 7:49 p.m.
Created at: April 10, 2026, 11:35 a.m.