Triple

T18472822
Position Surface form Disambiguated ID Type / Status
Subject Nam Ngum 2 Hydropower Project E451343 entity
Predicate hasComponent P35 FINISHED
Object Nam Ngum 2 Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nam Ngum 2 Dam | Statement: [Nam Ngum 2 Hydropower Project, hasComponent, Nam Ngum 2 Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nam Ngum 2 Dam
Context triple: [Nam Ngum 2 Hydropower Project, hasComponent, Nam Ngum 2 Dam]
  • A. Nam Ngum 2 Dam chosen
    Nam Ngum 2 Dam is a major hydroelectric power dam in Laos that generates electricity by harnessing the flow of the Nam Ngum River.
  • B. Nam Ngum 1 Dam
    Nam Ngum 1 Dam is a major hydroelectric dam in Laos that forms the Nam Ngum Reservoir and plays a key role in the country’s power generation and regional electricity exports.
  • C. Nam Ngum 3 Dam
    Nam Ngum 3 Dam is a major hydroelectric power project in Laos built on the Nam Ngum River to generate electricity and support regional energy development.
  • D. Nam Ngum 4 Dam
    Nam Ngum 4 Dam is a hydroelectric power facility in Laos that forms part of the Nam Ngum River’s cascade of dams used for electricity generation and regional power supply.
  • E. Nam Ngum 5 Dam
    Nam Ngum 5 Dam is a hydroelectric power facility in Laos that harnesses the Nam Ngum River to generate electricity for the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38465a0819099b9b42d2a662ac1 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e530617e48819091240d4405e53aaa completed April 19, 2026, 7:43 p.m.
Created at: April 10, 2026, 11:34 a.m.